Electricity Rates and Breakdown of Generation Charge
Electricity Rate Month of December 2025 (Butuan City) HIGH VOLTAGE High Voltage (Commercial) Php 7.6635 /kWh High Voltage (Industrial) Php 7.6635 /kWh High Voltage (Public Building) Php 7.6635 /kWh High Voltage (Street Light) Php 7.6635 /kWh LOW VOLTAGE Low Voltage (Commercial) Php 8.6623 /kWh Low Voltage (Public Building) Php 8.6623 /kWh Low Voltage (Street Light) Php 8.6623 /kWh RESIDENTIAL VOLTAGE Residential (BAPA) Php 10.5461 /kWh Residential (Residential) Php 10.5461 /kWh Download Electricity Rates Breakdown of Generation Charge Month of December 2025 Month of November 2025 Month of October 2025 Month of September 2025 Month of November 2025 Month of October 2025 Month of September 2025 Month of August 2025
Applying for Electric Service Connection?
Steps: Attend Pre-membership Seminar. Seminar Schedules: ANECO Central Office Tuesday, 1:00 PM Area 1 Cabadbaran City Friday, 1:00 PM Area 2 Nasipit, ADN Friday, 1:00 PM Tungao Sub-office Monday, 1:00 PM Visit the Application Evaluator at the Consumer Welfare Desk (CWD) of the Consumer Sevices Department (CSD) located at the ground floor for the following requirements: Municipal Mayor’s Permit or Certificate of Final Electrical Inspection/Completion (yellow copy) or Permit for Temporary Service Connection (with control number and complete signatures) Electrical Plan duly signed and sealed by a Professional Electrical Engineer (PEE) Certificate of Ownership from Housing Developer (if under a housing/real state developer), or location sketch/plan (if not under a housing program). Follow up on the third day at Consumer Welfare Desk on the status of your application. If approved, bring/submit the additional requirements listed below to the Application Evaluator, if disapproved due to non-compliance to the standards, inquire at […]